On April 5, it was reported that Meta plans to secure a loan of approximately $3 billion to fund the construction of a large-scale AI data center named 'Prometheus.' The project, with a capacity of 1 gigawatt, integrates the data center with an independent power generation system, utilizing natural gas to reduce reliance on the external power grid. Located in Ohio, USA, the project is operated by private equity firm EQT and adopts an 'island mode' to ensure continuous operation. Initially, it will rely on its own power generation, with the potential to connect to the public grid in the future.
