Tinci Materials: The Pilot Line for Hundred-Ton-Scale Lithium Sulfide and Solid-State Electrolytes is Expected to be Completed in the Second Half of 2026
1 week ago / Read about 0 minute
Author:小编   

Tinci Materials stated on an interactive platform that it is currently obtaining the preliminary approval procedures for its pilot line of hundred-ton-scale lithium sulfide and solid-state electrolytes, with the production line construction expected to be completed in the second half of 2026.