NIO has successfully completed the construction of the world's highest power swap station in Dingri County, Xigaze, located at an impressive altitude of 3,947 meters. The station is set to commence operations soon, marking a significant milestone in enhancing the energy infrastructure along the Sichuan-Tibet Highway. This strategic deployment will facilitate comprehensive coverage of the power swap network, stretching from Chengdu all the way to Everest Base Camp. As of July 14, NIO boasts a nationwide network of 3,402 power swap stations and 4,667 charging stations, with access to over 1.3 million third-party charging piles, further solidifying its position as a leader in electric vehicle charging solutions.