The Jilin Petrochemical–Jilin Oilfield CO2 long-distance pipeline project has been completed and put into operation. This marks China's CO2 long-distance pipeline with the longest transmission distance, the largest pipe diameter, the highest design pressure, and the greatest transmission capacity. Spanning the three cities of Jilin, Changchun, and Songyuan, the pipeline extends a total length of 277.6 kilometers, operates at a design pressure of 14.5 megapascals, and has an annual transmission capacity of 3.3 million tons. The upstream Jilin Petrochemical 800,000-ton-per-year CO2 recovery project has been fully operational, providing a stable gas source for the pipeline. China National Petroleum Corporation is leveraging this pipeline as a trunk line to advance the layout of the regional carbon capture, utilization, and storage industry.
