LONGi Green Energy: At Present, BC Module Production Capacity Is Being Ramped Up, Anticipated to Hit 50GW by Year-End
16 hour ago / Read about 0 minute
Author:小编   

On November 10, Zhong Baoshen, who serves as both the Chairman and General Manager of LONGi Green Energy, disclosed during the company's performance briefing that the mainstream mass - production power output of the company's BC modules has reached the range of 650 - 655W. In comparison, the mainstream power output of TOPCon modules stands at around 630W. Presently, the production capacity of BC modules is undergoing a ramp - up process, and it is projected to reach 50GW by the end of the year.