Jinlu Electronic: The capacity utilization rate of the Hubei production base has reached the expected level
2 week ago / Read about 0 minute
Author:小编   

Recently, during an institutional research visit, Jinlu Electronic stated that after the capacity ramp-up in 2025, the capacity utilization rate of the Hubei production base has reached the expected level. The Qingyuan base in Guangdong continues to operate at full capacity, and the company's overall capacity utilization rate remains high.