The ambitious Terafab semiconductor manufacturing project proposed by Musk may face even more complex challenges than building rockets and exploring Mars. According to a report by Maeil Business News Korea, several semiconductor industry experts have expressed doubts about the feasibility of the plan. A source familiar with the internal situation at TSMC pointed out that while building a wafer fab is not difficult, the real challenge lies in ensuring the continuous stability and high yield of chip production.
