TSMC announced on July 29 that following the magnitude 7 earthquake in Kumamoto, Japan, the inspection and calibration of local factory equipment will take time and is currently under recovery. Water supply, power supply, and safety systems are functioning normally, and the supply of raw materials has not been disrupted. Construction of the second plant has resumed.
