SK Hynix has rolled out a trial production line for its cutting-edge 1b DRAM at its Cheongju M15X facility, aiming to keep pace with the escalating demand for High Bandwidth Memory (HBM). Citing information from The Bell, the equipment setup is projected to wrap up by November 2025, and initially, the monthly production volume is anticipated to hit 10,000 wafers.